99久久精品美女高潮喷水十八,人妻操15p,深爱激情在线精品,北岛玲在线视频中文无码

歡迎訪問永誠廣建公路材料(山東)有限公司網站!

永誠廣建公路材料(山東)有限公司

熱線電話

15165180688

您現在所在的位置 :首頁 - 新聞中心 > 公司新聞

公司新聞

冷補瀝清生產過程中要特別注意的事情

來源:http://www.66975.cn/ 日期:2023-01-09
冷補瀝青是公路施工常常應用到的材質,應用次數特別高,并且應用后的作用也特別明顯,安全駕駛更穩(wěn)定、地面更美觀大方、使用年限更長、修復起來也更便于,也由于這種優(yōu)勢的存有,該材質特別受大家喜愛,那麼你對該商品的生產制造有哪些掌握嗎?下邊濟南瀝青生產廠家就為各位簡易介紹一下冷補瀝清生產過程中須要特別注意的事情吧。
Cold patched asphalt is a material often used in highway construction. It has been used for a very high number of times, and has a particularly obvious effect after application. It is more stable for safe driving, more beautiful and generous ground, longer service life, and easier to repair. Because of this advantage, this material is particularly popular. What do you know about the production of this product? Next, Jinan asphalt manufacturer will briefly introduce the matters needing special attention in the production process of cold patching asphalt.
1、制得石油瀝青的加溫的溫度不能高過140℃。在制得全過程中,先加上柴油機,再放進添加劑。改性材料后的瀝清溫控在100-120℃中間,攪拌均勻。
1. The heating temperature of petroleum asphalt shall not be higher than 140 ℃. In the whole process of preparation, the diesel engine is added first, and then the additives are added. The asphalt temperature of the modified material shall be controlled between 100-120 ℃ and stirred evenly.
2、攪拌時,倘若石頭是干的,冷補瀝青可以用強制性式攪拌裝置攪拌。當它不干躁時,可以用文火或無火的攪拌裝置混和,如此一來可以控制成本。干躁的溫度不能高過80℃。
2. When mixing, if the stone is dry, the cold patched asphalt can be mixed with a mandatory mixing device. When it is not dry, it can be mixed with a slow fire or a flameless stirring device, so that the cost can be controlled. The temperature of dryness shall not be higher than 80 ℃.
濟南瀝青生產廠家
3、生產制造出來的冷補瀝清用布袋子計量器包裝,有益于儲存和運輸,可以提升儲存時間,為財務核算產生穩(wěn)定的根據。
3. The cold make-up asphalt produced by the manufacturer is packed with cloth bag metering device, which is beneficial to storage and transportation, can improve the storage time and generate a stable basis for financial accounting.
4、堿石是有效的挑選,礦渣微粉的含水量小于2%,油石比可降低0.3-0.5%。
4. Alkali stone is an effective selection. The water content of slag powder is less than 2%, and the oil stone ratio can be reduced by 0.3-0.5%.
5、冷補瀝青進深125px以上的基坑應逐步壓實。填平時要均勻,比地面高0.5-37.5px。搗實后,在坑的表面均勻鋪地上一層層石頭或細沙,消除整潔,使細沙添充坑的表面空隙。
5. The foundation pit with cold patched asphalt deeper than 125px shall be compacted gradually. The filling shall be even, 0.5-37.5px higher than the ground. After tamping, the surface of the pit shall be evenly paved with layers of stones or fine sand to eliminate tidiness and make the fine sand fill the surface space of the pit.
以上就是問題“冷補瀝清生產過程中要特別注意的事情”的相關解答內容了,您對此有怎樣的問題或者需求,可以隨時來我們網站http://www.66975.cn進行了解咨詢!
The above is the answer to the question "What should be paid special attention to during the production of cold fill asphalt". If you have any questions or needs, you can come to our website at any time http://www.66975.cn Get to know!
  • 上一條:不同路面機械設備的使用方式
  • 下一條:水穩(wěn)攪拌站的修理方法
  • 相關產品:

    亚洲日本中文字幕永久| 人人妻人人操人妻| 综合欧美日韩国产成人高清| 欧美57页| 国产又粗又猛又爽又黄观看| 亚洲日韩精品国产精品激情| 黄色三级无毛视频| l六月婷婷中午字幕| 亚洲www啪成人一区二区麻豆| 亚洲人在线播放器| 日韩黄片在线看国外| 国产国拍亚洲精品永久尤物| 大香蕉自拍av韩日| 丝袜美腿精品国产二区| 动漫AV在线播放网址| 日韩精品无码影片| 成人国产在线| 五月激情啪啪综合| 精品黄片一区| 精品一区二区免费视频| 国产成人精品日本欧美动漫| 不卡无码无| 无码喷水视频青青草| 激情小说图片亚洲综合| 国产第一页91| 免费完整版一级毛片| 久久久久久无码人妻A∨| 在线导航AV| 国产精品自拍电影| 青青草国产精品日韩欧美| 夜夜嗨九色av| 最刺激的欧美三级中文字幕| 全裸美女免费毛片| 欧美精品炮图一区二区三区| 精品一区二区三区无码视频网| 美女被干到高潮| 国产一二三区精品亚洲美女| 人妻av中文字幕一区二区三区 | 玖玖国产亚洲| 久久电影网午夜鲁丝片免费| 三级无码日韩|