99久久精品美女高潮喷水十八,人妻操15p,深爱激情在线精品,北岛玲在线视频中文无码

歡迎訪問永誠(chéng)廣建公路材料(山東)有限公司網(wǎng)站!

永誠(chéng)廣建公路材料(山東)有限公司

熱線電話

15165180688

您現(xiàn)在所在的位置 :首頁 - 新聞中心 > 公司新聞

公司新聞

濟(jì)南水泥穩(wěn)定碎石施工時(shí)要注重什么問題

來源:http://www.66975.cn/ 日期:2022-03-25
  水泥穩(wěn)定碎石成活后遇雨不泥濘,表面堅(jiān)實(shí),是高級(jí)路面的理想基層材料。因此現(xiàn)在是越來越受歡迎,而且使用的范圍也是愈加廣闊。那么你知道水泥穩(wěn)定碎石施工時(shí)要注重什么問題嗎?
  Cement stable gravel alive after rain is not muddy, solid surface, is the ideal base material for advanced pavement. So now it is more and more popular, and the scope of use is more and more wide. So what problem should you notice when cement stabilizes macadam construction?
  首先檢查底基,復(fù)核控制樁標(biāo)高。水泥穩(wěn)定碎石鋪裝前,應(yīng)將底基層清理干凈,并灑適量水保持濕潤(rùn)。
  First check the base and check the elevation of the control pile. Before cement stabilized gravel paving, the base should be cleaned up, and sprinkle the right amount of water to keep wet.
  混合采用集中工廠混合。工廠攪拌設(shè)備使用前,應(yīng)對(duì)使用過的工廠攪拌設(shè)備及各計(jì)量系統(tǒng)進(jìn)行調(diào)試,使混合料的含水量、骨料級(jí)配、水泥含量達(dá)到配比要求,使機(jī)器正常運(yùn)行。輸出與所用鋪路的容量一致。
  Mixing adopts centralized factory mixing. Before using the mixing equipment in the factory, the used mixing equipment and the measurement system should be debugged to make the water content, aggregate gradation and cement content of the mixture meet the proportion requirements and make the machine run normally. The output corresponds to the capacity of the pavement used.
  攤鋪、碾壓時(shí),攤鋪系數(shù)在3-5之間,施工中必須貫徹“寧高不低,不刮”的原則,所有施工項(xiàng)目應(yīng)在水泥終凝時(shí)間前完成.滾壓后立即進(jìn)行密實(shí)度測(cè)試,如果測(cè)試結(jié)果不符合標(biāo)準(zhǔn),重新滾壓。
  Paving, rolling, paving coefficient between 3-5, the construction must be carried out in the "rather high not low, not scraping" principle, all construction projects should be completed before the cement final setting time. Compactness test is carried out immediately after rolling. If the test result does not meet the standard, roll again.
  一般情況下,濟(jì)南水泥穩(wěn)定碎石作業(yè)完成24小時(shí)后,方可鋪設(shè)邊石。與砌筑的時(shí)間間隔不宜過長(zhǎng),否則混合料形成板坯后,板坯會(huì)變硬,增加施工難度,敲擊板容易破壞板坯的完整性。平板。
  Under normal circumstances, Ji 'nan cement stable gravel operation is completed 24 hours after the laying of edge stone. The time interval with masonry should not be too long, otherwise, after the slab is formed by the mixture, the slab will harden, increasing the difficulty of construction, and knocking the slab is easy to destroy the integrity of the slab. The tablet.
  維護(hù)時(shí)間不少于7天。在此期間,禁止車輛通行。灑水器每天灑水2至4次,以保持其濕潤(rùn)。
  The maintenance duration is no less than 7 days. During this period, no traffic is allowed. Sprinklers are sprayed 2 to 4 times a day to keep them moist.
  由于水泥穩(wěn)定碎石的施工時(shí)間短,同時(shí)要求一次性達(dá)到質(zhì)量標(biāo)準(zhǔn),否則成型的板體不容易修整。因此,要加強(qiáng)施工管理,提高施工機(jī)械化程度,形成規(guī)模化、標(biāo)準(zhǔn)化的作業(yè)方式,輕松滿足水穩(wěn)的施工要求。
  Due to the short construction time of cement stabilized macadam, at the same time, it is required to meet the quality standard at one time, otherwise the plate body is not easy to repair. Therefore, it is necessary to strengthen construction management, improve the degree of construction mechanization, form a large-scale, standardized operation mode, easily meet the requirements of water stability construction.
  濟(jì)南水泥穩(wěn)定碎石施工時(shí)要注重什么問題?以上便是問題的相關(guān)解答了,如果您還有其他不明白的內(nèi)容,歡迎點(diǎn)擊http://www.66975.cn網(wǎng)址來咨詢!
  • 上一條:濟(jì)南路面機(jī)械設(shè)備的軸承怎么合理更換?
  • 下一條:使用濟(jì)南瀝青料時(shí)對(duì)天氣溫度有要求嗎?
  • 相關(guān)產(chǎn)品:

    相關(guān)新聞:

    69视频在线观看精品免费| 五月终合色图| 丰满人妻一区二区三区蓝牛| 精品国产一区二区三区av性色| www7777人| 欧美日本字幕| 男女全黄一级高潮| 人妻系列无码av| 另类老熟妇| 成人午夜不卡高清福利| 五月婷婷激情丁香| 蜜桃成人品免费网站| 国产高清自拍视频| 亚洲av片无码| 久久 中文字幕 亚洲| 婷婷综合久久一区二区三区| 日本少妇XXXX| 国产麻豆精品久久一二三| 日本乱偷人妻中文字| 人妻搭讪内射| 日韩美女免费在线| 亚洲无码色噜噜综合| 国产精品视频导航| 好大好湿硬顶到了的好爽视频| 国产精品换脸日韩| 欧美ab国产一区二区激情| 中文字幕伊人久久网| 久久久久成人免费视频| 天天干天天日婷婷| 久久国产一区二区日韩Av| 国产欧美日韩精品丝袜高跟鞋| 国产精品午夜久久久久久久| 高清无码国产精品内射| 内射老骚妇| 日本高清www| 极品AAA| 日本午夜中文字幕| 亚洲熟妇乱码| 欧美日韩熟妇中文字幕 | 五月天天色色欧美色图| 日韩精品国内精品制服丝袜|